Refer to the Technical Design Requirements for Alberta Infrastructure Facilities for additional requirements. Any questions, email Cam Munro at or 780-422-7456.
Pre-design
File name | Form name | Revision date |
---|---|---|
1998_Schedule_of_Fees_AAA_APEGA | Recommended Conditions of Engagement and Schedule of Professional Fees for Building Projects (AAA APEGA) | May 1998 |
Bldg Envelope Cx | Guideline for Building Envelope Commissioning: New Buildings | August 2016 |
FloodRiskMgmt | Flood Risk Management Guidelines for Location of New Facilities Funded by Alberta Infrastructure | November 2022 |
WildfireProtection | Guideline for Wildfire Protection of Institutional Building in Forested Regions in Alberta | March 2013 |
GeoTechGuide | Geotechnical Investigation Guidelines for Alberta Infrastructure Projects | March 2022 |
Solar Photovoltaic Guidelines | Planning and Installation for Alberta Infrastructure Projects | December 2017 |
LEEDCostAnalysis | LEED Gold Certification Cost Analysis | April 2009 |
SummaryReport | LEED Gold Certification Cost Analysis | July 2008 |
Environmental hazards
File name | Form name | Revision date |
---|---|---|
EMR | Environmental Management Requirements (EMR) for Hazardous Materials and Contaminated Sites | September 2016 |
HazardousMaterialsWorkProcess | Process required by Project Managers when working on buildings which may contain hazardous materials. | February 2014 |
Environmental Management Requirements (EMR) Checklists | Asbestos Checklist | 2020-11-30 |
Biohazardous Material Checklist | 2020-11-30 | |
CFCs Checklist | 2020-11-30 | |
Hydrocarbon Checklist | 2020-11-30 | |
Lead Checklist | 2020-11-30 | |
Mercury Checklist | 2020-11-30 | |
Mould Checklist | 2020-11-30 | |
PCB Checklist | 2020-11-30 | |
Radioactive Checklist | 2020-11-30 | |
Unidentified Abandoned Chemicals Checklist | 2020-11-30 | |
ContaminatedSitesWorkProcess | Process required by Project Managers when working on sites which may contain hazardous materials. | December 2022 |
Technical design requirements
File name | Form name | Revision date |
---|---|---|
TechDesignRequirements | Technical Design Requirements for Alberta Infrastructure Facilities (TDR) | August 2022 |
SmudgeRmGuide | Addendum #1 to the Technical Design Requirements: Design Guidelines for Smudging Rooms in Alberta Infrastructure Facilities | 2023-11-02 |
TDRAddendum2Sept4 | Addendum #2 to the Technical Design Requirements: Design Requirements Appendix 1, Workspace Furniture Typical | September 2024 |
Design documents
File name | Form name | Revision date |
---|---|---|
Guide Universal Washroom | Guidelines for Inclusive Design Universal Washroom | February 2019 |
TDR Climate Resiliency Study | Infrastructure recently completed a study to identify future climate change impacts on Alberta’s public buildings. | July 2018 |
AHS_Struc_Cab_Req_V2-3 | Alberta Health Services Structured Cabling Requirements, Version 2.3 | September 2016 |
SecurityGuidelinesStandards | Physical Security Guidelines & Standards for Government of Alberta Facilities, Version 2.0 | January 2018 |
Open Office Etiquette | Alberta Government Workplace Etiquette Reference Document | January 2017 |
UniversalDesign | The Seven Principles of Universal Design | August 2011 |
Workplace-ergonomics | Workplace Ergonomics | June 2020 |
Design and technology series
The Design and Technology Series (DTS) provides introductory information to Project Teams on building design, construction best practices, emerging technologies, and sustainability. The DTS documents are for research purposes only and do not constitute official Government of Alberta policies or regulations.
Ongoing information covering design, technology and innovative topics. Both the "Design & Technology Series", and the "Research Papers" are relevant to Government of Alberta projects.
Document number | Revision date |
---|---|
01 - PERSIST | October 2016 |
02 - Sloped vs. Vertical Glazing | October 2015 |
03 - Green Roof Design | October 2015 |
04 - Building Integrated Photovoltaics | October 2016 |
05 - EIFS Assemblies | October 2016 |
06 - Understanding Insulation | December 2016 |
07 - Green Building Standards | May 2017 |
08 - Operable Partitions | September 2017 |
09 - Electric Vehicles | January 2018 |
10 - Deeper Greening | October 2018 |
11 - Well Building Standard | December 2018 |
12 - Rooftop Photovoltaics | August 2019 |
13 - Top Ten Design Things to Watch For | January 2020 |
14 – Footfall Furniture Movement Noise in Schools | August 2024 |
Research papers
File name | Form name | Revision date |
---|---|---|
Solar Energy for Public Buildings in Alberta | May 2016 | |
District Energy and Co-generation for Public Buildings in Alberta | June 2016 | |
Renewable Energy Strategies for Communities in Alberta | October 2016 | |
BarrierFree2017 | Barrier-Free Design Guide, 2017 | June 2017 |
EMCSGuideline_2002 | Alberta Infrastructure Energy Management Control System (EMCS) Guideline for Logical Point Mnemonics | March 2002 |
Digital project delivery
File name | Form name | Revision date |
---|---|---|
BidDocumentChecklist | Bid Document / Drawing Review Checklist | June 2017 |
AIMReqConsultant | Asset Information Management, Consultant Requirements | March 2018 |
AIMReqContractor | Asset Information Management, Contractor Requirements | March 2018 |
AIMReqDesignBuild | Asset Information Management, Design-Builder Requirements | March 2018 |
AIMExPlanTemplate | Asset Information Management, Execution Plan Template | March 2018 |
BIMReqConsultant | Building Information Modelling, Consultant Requirements | March 2018 |
BIMReqDesignBuild | Building Information Modelling, Design-Builder Requirements | March 2018 |
BIMCOBieReq | Building Information Modelling, COBie Requirements | March 2018 |
BIMExPlanTemplate | Building Information Modelling, Execution Plan Template | March 2018 |
ConsultantDeliverables | Alberta Infrastructure Standards for Consultant Deliverables for Building Projects | March 2021 |
SpecPrep | Project Manual (Specifications) Preparation Instructions for Alberta Infrastructure Building Construction Contracts | February 2020 |
Construction
File name | Form name | Revision date |
---|---|---|
ProjectSignage (unavailable, currently being updated) | Capital Project Identification Signage Guidelines | October 2017 |
Contractor Start-Up Forms (unavailable, currently being updated) | Mechanical Contractor Start-Up Forms | July 2019 |
Electrical Contractor Start-Up Forms | July 2019 | |
Acoustic RT Guideline | Guide for Sufficient Diffusion for Reverberation Time Testing of Unoccupied and Unfurnished Gymnasium or Modular Classrooms | November 2019 |
Occupancy
File name | Form name | Revision date |
---|---|---|
POE Methodology | Post Occupancy Evaluation - Methodology | May 2022 |
POE Definitions | Post Occupancy Evaluation - Definitions | May 2022 |
Indoor Air Quality | Guide to Indoor Air Quality Management of Government Owned and Supported Infrastructure | May 2020 |
MouldManagement | Mould in Indoor Environments Risk Assessment and Management Program Handbook | June 2007 |
GreenGuide | Environmental Operations of Alberta Infrastructure Facilities, Third Edition | May 2018 |
Dispute resolution process
File name | Form name | Revision date |
---|---|---|
DisputeResolution | Dispute Resolution Process for Government of Alberta for Construction Contracts | 1997 |
Additional supported infrastructure documents
Pre-design phase
File name | Form name | Revision date |
---|
-->
File name | Form name | Revision date |
---|---|---|
GFNA062021 | Grossing Factors & Net Areas Guidelines For Healthcare Facilities in Alberta | June 2021 |
CCDS | Continuing Care Design Standards and Best Practices in Alberta, 2023 (CCDS) | October 2023 |
hi-ipc-hcf-design.pdf | Infection Prevention and Control Healthcare Facility Design Requirements (AHS) | October 2021 |
hi-ipc-hcf-toolkit.pdf | Infection Control Risk Assessment (ICRA) and Preventive Measures Toolkit for Construction, Renovation and Maintenance (AHS) | October 2021 |
Title block drawings
Each of the title block drawing files contains:
- Pre-loaded Alberta Infrastructure CAD layers for the selected discipline.
- Option to select variety of sheet sizes within the drawing file.
Size | File name | Revision date |
---|---|---|
A0 Title Block | GOA-AI-TSB-XX-TMP-A0_Project_Title_Block-001 | February 2020 |
A1 Title Block | GOA-AI-TSB-XX-TMP-A1_Project_Title_Block-001 | February 2020 |
A2 Title Block | GOA-AI-TSB-XX-TMP-A2_Project_Title_Block-001 | February 2020 |
11x17 Title Block | GOA-AI-TSB-XX-TMP-11x17_Project_Title_Block-001 | February 2020 |
Technical bulletins
File name | Form name | Revision Date |
---|---|---|
TB-001A | De-Icing Concrete | October 2016 |
TB-020B | Asbestos Management | September 2013 |
TB-037 | Arc Flash and Workplace Electrical Safety | September 2009 |
TB-038 | Security Considerations for Secure Rooms Located in Varied Use Facilities | September 2012 |
Subscription newsletter archive
Publications
Contact
Connect with Technical Services and Procurement Branch:
Phone: 780-422-7456
Fax: 780-422-7479
Email: [email protected]
Email: [email protected]